Friday, June 8, 2012

Friday 8th - Mairie re attic conversion

Another 8am start for the builder but he only worked until lunch-time and then disappeared for the weekend, normal for his team on Fridays. He has completely dismantled the wall now and got rid of the debris. His poor old off-sider has to cart buckets full of broken brick and concrete down the two flights of stair to toss in the back of their truck. The framework for the French doors between the living and bedrooms has been reinstated in its new location, the wall for the storeroom put up and about half of the gib board has been fixed.

The hold point is possibly due to the ongoing wait to hear back from one of the electricians. We need his quote so we can choose which of two electricians to go for, and then for them to do the work. The gib board can’t be fully put up until the new wiring is put in place. Monsieur Freitas rang the second electrician on Friday to give him a prod.

Repainting in the bathroom

Meanwhile, we spent a very profitable day in the bathroom! We put the first coat of paint on the ceiling and half the walls. I then scrubbed down all the tiles, prior to putting on a special super-adherent tile undercoat. We will then be able to put on the wall colour. It took ages to give the tiles and around the hot water cylinder a thorough clean. J put his efforts into yet another clean-up after the builders, including two complete spongings of all the floors,  and also spruce-up of the living room and kitchen so we can live in it in reasonable comfort over the weekend until the builders arrive again and all the plastic sheeting has to go back up.  We were pretty shattered by 6.30pm when we finished.

During the morning we took time out to go to the Mairie about our potential building plans for upstairs. They were very helpful but the person we need to talk to was tied up in a meeting. He rang us later and we now have an appointment for 11am Monday morning to see him. J also bumped into Mr Antonetti and managed to find out that the two store-rooms are actually a public part of the building, i.e. they are for the use of everyone. Mr Antonetti said he was planning to give all the owners a letter asking them to tag their stuff, and whatever is left untagged after a month or so will be taken to the dump.  After that, a portion of the available space will be available for each apartment to use for storage. We may have to pre-empt this letter going out. We figure very few of the owners of the building (actually two buildings joined together by two lobbies and two stairways) have made any use of the two upstairs storerooms. There is one empty apartment, one gallery, 5 apartment owners plus M. Vargas.

Mr Antonetti is a bit of a shaker and mover, which is good news. He is also talking about seeing if everyone will club together to pay for painting the interior of the building, mainly the stairwell. It will cost a bit but we are keen. J washed the windows and shutters of the downstairs mailroom – it looks so much better. I plan to sweep and wash out the floor sometime soon.